The Challenge
A skilled nursing home was looking to replace an undersized generator and upgrade the electrical switchgear, 2000 amp transfer switch and generator through out the failing electrical infrastructure. This emergency generator system would provide power to the entire facility and allow it to maintain all operations in case of an outage.
The Solution
Tower Generator was commissioned to upgrade the system and ensure that the facility had power 100% of the time throughout the installation. Through careful coordination and detailed planning, the Tower Generator team was able to skillfully navigate the upgrade including the electrical system changeover without any loss of power to the facility.