Inpatient Rehab Facility
This residential treatment center was in need of a reliable backup power system. They were looking to provide a safe environment for their clients in the event of a power outage. The three-story buildings and mature plantings made the typical methods of delivery and placement impossible. We utilized a 200-foot crane to lift the 2600lb generator over everything in order to safely place it on the concrete pad. Our client now has the much-needed standby power system that will offer protection for their patients and the facility. This delivery method and installation caused minimal interruption for their entire operation.
Where:
New Haven, Connecticut
What:
Cummins C80 diesel generator with an ASCO 300 Series Transfer Switch
Purpose:
To provide essential backup power that will allow the facility to operate as normal during a power outage.