Western CT Wells Phase 2
The second phase of the Western Connecticut well pump project consisted of three liquid-cooled generators with propane tanks. In the first phase we utilized air-cooled generators as they had smaller pumps but these new stations have larger pump demands that will require more power. The sizes range from 22kw to 40kw depending on the demand. Tower has done many well projects over the last few years and there is a great importance to these projects. Homes and businesses served by the sites can rest easier when the power goes out.
Where:
Danbury, New Fairfield and Brookfield, Connecticut
What:
Cummins C22 and C40 generators with transfer switches
Purpose:
To enable the people that are served by these pump stations to be able to have water even when the power fails