Greenwich
This boarding school had a catastrophic generator failure on a 350kw. After reviewing the project based on their current and future needs we recommended upsizing the replacement. The automatic transfer switch was operating perfectly so it was used with the new generator. The new 450kw will handle today’s requirements and have some added capacity for the future. The project is complete and the school can rest assured that this portion of their facility is prepared to operate as usual during future power outages.
Where:
Greenwich, Connecticut
What:
Cummins 450 DFEJ diesel generator with a 500 gallon sub base tank
Purpose:
A failed generator required a replacement that was sized for today’s requirements.